  • Connection design services

  • Our Long Term Development Statements provide information about existing network loadings. Visit www.ssen.co.uk/LTDS/.

    We can also provide a report with an up-to-date review of the available network capacity. The report will briefly review the present level of capacity near the potential connection point, associated network and primary transformer or grid supply point.  The capacity report is not part of the regulated application process and may have longer response times. You will also have to pay a fee for it.

    If you are still in the early stages of your project and can only provide outline details, then a budget estimate or a feasibility study may be best. See below for details of the differences in timescales, costs and details required. 

    We don't charge for a formal quotation. However financial and contractual obligations do apply.  Quotations will be on the basis of an all-works offer with individual values for contestable and non-contestable elements, or a non-contestable only offer. (where the applicant is considering undertaking the contestable works with an ICP).